This downloadable package features a Primavera P6 schedule (XER format) developed for a Condensate Storage Facility project within the Oil Gas & Petrochemical sector. The schedule reflects a real EPC/EPC-C contract structure, including engineering, procurement, construction, and commissioning phases, with activities aligned to actual contract terms and client requirements.
Along with the schedule file, you’ll receive resource deployment details, manpower histograms, equipment Histogram used during project execution. These deliverables provide practical insights into:
- Work breakdown structure (WBS) development for oil & gas projects
- Activity sequencing and logic based on EPC workflows
- Resource loading, productivity norms, and manpower planning
- Histogram analysis for both direct and indirect manpower
- Equipment utilization and welding productivity benchmarks
