- Construction Work Item Productivity Norms – Complete Pack
- Construction Work Item Productivity Rates (Complete Item-Wise Productivity Norms)
This comprehensive productivity norms pack contains item-wise man-hour rates, daily production outputs, crew compositions, and equipment requirements for more than 200+ civil, structural, architectural, MEP, and infrastructure activities.
Designed specifically for Primavera P6 planners, schedulers, estimators, project control engineers, QS teams, and field engineers, this pack delivers accurate, real-world productivity data collected from:
- Actual construction projects
- Verified field measurements
- Standard industry benchmarks
- EPC & infrastructure work-rate studies
- Decades of combined project controls experience
Whether you are preparing a baseline, reviewing a contractor’s submission, performing resource loading, calculating man-hours, determining equipment hours, or validating actual productivity vs planned, this pack gives you everything you need in one place.
Each item includes:
- Man-hour rate (MH/Unit)
- Productivity rate per day
- Crew size & labor mix
- Equipment required
- Equipment output capacity
- Applicable activity type (civil, structural, MEP, finishing, etc.)
This makes it one of the most practical and powerful tools for everyday use in construction planning, scheduling, estimation, and project controls.
Build accurate schedules, estimates, and resource plans with confidence.
This powerful Construction Work Item Productivity Pack gives you instant access to realistic, field-tested productivity rates for all major construction disciplines, including:
- Demolition & site preparation
- Excavation, backfilling & grading
- Concreting & rebar
- Masonry & blockwork
- Structural steel
- Waterproofing, finishing & carpentry
- Plumbing, sanitary, stormwater
- Electrical & utilities
- Roofing, tiling, doors, windows & architectural finishes
- Specialties & MEP details
Each item includes Man-hour rate, daily production output, crew size, labor types, equipment required, and equipment productivity, all derived from real-world site data, not assumptions.
Perfect for:
- Primavera P6 duration calculation
- Recourse Calculation
- Recourse Distribution
- Cost Estimation/Assignment
- Resource assignment
- Resource leveling
- Manpower forecasting
- Equipment hour calculation
- BOQ estimation & rate analysis
- Earned value & productivity tracking
- Contractor productivity verification
- Delay analysis & time-impact studies
Whether you work in construction, EPC, oil & gas, infrastructure, or consulting, this pack will save you time, increase your accuracy, and elevate the quality of your planning and estimation work.